South Wall Refacing

To accommodate a new HV/AC system, the south wall needed to be reinforced; the brick parapet was in vey poor condition and needed to be removed. 4 sections of brick were removed and concrete was poured in its place. We are still looking at several finish options for the exterior.

Most Recent Restoration News

Orchestra Pit

Orchestra Pit

While the Fox was originally equipped with an orchestra pit that could fit 24 musicians, the...

read more